Row
|
Suggestion
Title
|
Suggestion
Number
|
1
|
Condensate
injection into the inlet vapor Reboiler E-3111
|
890010001
|
2
|
Removing coke
particles from PFO cycle of Olefin Plant
|
890010024
|
3
|
Separation of
TK-9101B in Olefin Plant for storing
C3+ Feedstock
|
890010058
|
4
|
Recycling
under size granules of LLD Plant and changing
them to ON Product
|
890030001
|
5
|
Using Finawax additives of LLD Plant
|
890030010
|
6
|
Eliminating
Dead Points of reactor R- 201 of butane-1
Plant
|
890050008
|
7
|
Replacing
temperature sensors type S with K
|
890070014
|
8
|
Modifying the
pseudo performance of mercury Level Switches of
Olefin furnaces
|
890070015
|
9
|
COD
Reduction of surface water canals
|
890170002
|
10
|
Determination
of catalytic sludge and separation of its existing titanium in HD Plant
|
900020012
|
11
|
Injection reduction
of B561 and calcium stearate chemicals in LLD Plant extruder (reducing use of additive)
|
900030025
|
12
|
Reduction of
the potential danger of unloading and loading spent catalyst waste and
determining the appropriate method for principal removal as needed
|
900050018
|
13
|
Selling the
export licenses of the complex
|
900200079
|
14
|
Neutralizing
and removing peroxide material of LD Plant
|
900200128
|
15
|
Using waste Hexane
|
910020002
|
16
|
Increasing
capacity of butane-1 Plant
|
910200008
|
17
|
Installing
isolation valve on filter of compressor 470
|
910200172
|
18
|
Reducing the
film thickness associated with rolls of the bags used in Polymeric Plants
|
890020010
|
19
|
Designing new
F&G Systems instead of the current out of service
systems of the lower floor of the central workshop and the upper floor
to the panel inside the central workshop
|
920100032
|
20
|
Adding the
capacity of central Fire Alarm Panel in HSE building
|
920100014
|